The transport of KRAH MISR pipes is very easy as they are very good to move due to the low weight. It only has to be ensured, that the pipes cannot move and that they are stored in the right way.

Forklifts with a rod of 5 meters are very suitable for the handling of the pipe in the production facilities. On site no additional heavy devices are needed.

For the storage of the pipes and fittings it is absolutely necessary that they are stored on even ground, free of stones and sharp edged objects, so that point-loads are avoided. Further it is important to make sure that the sockets of the upper layer are not contacting the sockets of the lower layer. A maximum height of 4 meters should not be exceeded. Generally there should be three wood bearing supports to guarantee a good load distribution.

The installation of KRAH MISR pipes is very easy. After the trench has been prepared in the same way as for all other pipes the KRAH MISR pipe is laid down and aligned. The individual pipe parts are jointed with the different kinds of jointing techniques. The backfilling has to be carried out according to the requirements of the statical calculations. Installation of a KRAH MISR pipe acc. to EN 1610

Leakage test
According to the requirements pipe systems have to be tested for leakage.

The easy handling of KRAH MISR pipes